|
Stretch Ceilings Systems
The
dimensions of your room are measured and then all the elements are
tailor-made in the factory. We then attach the frame on site to
the ceiling or wall. The membrane is heated in order to expand it
into the frame. Once this is securely anchored in situ, the room
temperature will drop and the membrane will naturally shrink into
a taut, strong membrane.
The installation process is carried out by experienced
professional operatives who will cause no mess and cause the the
minimum of disruption.
|
Technical Data
|
|
|
Definition
A PVC sheet presented in rolls welded together by means
of a high frequency welding system.
|
Presentation
Thickness: 0.15mm to 0.20mm
Thickness mock suede: 0.35mm
Width of rolls: 1300mm to 2000mm
Choice of colours according to pallet
|
| |
|
|
Surface finishes
|
Safety
|
|
Matt
Satin
Gloss
|
Perforated
Marble effect
Mock suede
|
Metallic effect
Sand effect
Daylight
|
Fire classification: Assessed to class '0'
Air tightness: Around 100%
Dimensional Stability: -5° c to +50° c
Water vapour permeability: BS 3177 : 1959
|
| |
|
|
Frames
PVC Ceiling frame
PVC Wall frame
Aluminium Ceiling Frame
Aluminium Wall Frame
Aluminium Separator
|
Installation
Attached by interlocking to frames providing a removable
system.
|
| |
|
|
|
|
|
|
Length
|
Width
|
Unit
|
Standards
|
|
Resistance to breaking
|
16
|
15
|
N/sq.mm
|
NF EN ISO 527-3
|
|
Breaking elongation
|
>/= 130
|
>/=140
|
%
|
NF EN ISO 527-3
|
|
Trapezoidal tearing
|
150
|
125
|
N/mm
|
NF T ISO 54-108
|
|
Resistance to cold
|
-5
|
|
°C
|
NF T 544-110
|
| |
|
|
|
|
|
NFP 92 503
Test carried out by the
MORTON Laboratory
|
XENOTEST
NFT 51-056
|
All test reports and other statistical information available on
request
|